Check out our progress

on the farm!

WE DID IT!!!

Over the past 10 months we have turned our 1950’s chicken coop into a work of art. With family and friends by our side, WE DID IT! Our dream would not have been a reality without their hard work, love and support. Mike and I are truly blessed.

On September 16th, we celebrated our daughter’s wedding here at the farm. It was a humbling and joyous experience that we will never forget. The smiles throughout the day made our hearts full.

Thank you for embarking on this journey with us! Even though the major remodeling has been completed, stay tuned for designer and fun updates. I have a few more ticks up my sleeve!!

Follow us on Facebook @ https://www.facebook.com/evergreen.farms2022/



9/24/2023

Say Goodbye to the Floor!

Yesterday was a big day in The Coop! A 60 foot section of the ceiling was taken down! It simply is amazing! The view of the beams against the black metal ceiling is jaw dropping! Pictures do not do the space justice. Being in The Coop is an experience that just may bring tears to your eyes!

Follow our progress on Facebook @ https://www.facebook.com/evergreen.farms2022/



8/10/2023

So much has changed!!!

If you haven’t seen the venue in awhile, so much has changed!!! The 2 upstairs dressing rooms are the epitome of elegance and sophistication. Our couples and their wedding parties will sit comfortably in our stylish and modern salon chairs. Each room adorns a plethora of mirrors, comfortable seating, and designated changing areas. The upstairs bathroom has been tiled! The 3 first-floor bathrooms are unique in design. Trim, mirrors, and faucets are next on the list! One first-floor wall is awaiting shiplap which will complete both floors. Light fixtures have been hung. Covers to the ceiling heating and AC units were being installed today along with the wall control panels. We are rocking and rolling!!!

Follow our progress on Facebook @ https://www.facebook.com/evergreen.farms2022/



7/21/2023

Sheetrock and Tables!

What a busy couple of weeks we have had on the farm!! Drywall Designs did a wonderful job with the catering prep room, 4 bathrooms, bar, and service closets!! Highly recommend!! Over the weekend the 8 ft farmhouse tables started getting some love. The walnut stain and black metal legs really make them exceptional! Mike and I also had great success with the beautiful water feature! Stay tuned for updates on that project (check out our video on Instagram!!!) Follow our progress on Facebook @ https://www.facebook.com/evergreen.farms2022/



6/12/2023

Busy Bees!!

So much has happened here at the farm over the past few weeks! Lighting in the 2nd-floor dressing rooms has been installed! A mixture of black and brass really make the shiplap pop! And look at our hardwood floors!!! Mike is doing a FANTASTIC job with the installation! The Evergreen Farms sign was completed (with the correct spelling for those of you who follow our Facebook page LOL) and hung on the Western wall. On the 1st floor, the catering prep room, 3 bathrooms, and bar are being sheet-rocked as we speak! Stay tuned for my next post with landscaping, flooring, ceiling, sound, and lighting updates!! Follow our progress on Facebook @ https://www.facebook.com/evergreen.farms2022/



5/23/2023

White Walls!

Busy day at the farm!! The two upstairs dressing rooms got a little love today! Planning on keeping the bottom natural and painting the thin transition strip black. It’s going to look FAB-U-LOUS!!! The second floor will also get the same treatment! Love the look of the white against the wood. Stay tuned for more pictures to follow!!



4/22/2023

Shiplap Update!

90% of the 2nd floor has been ship lapped! Today Rick was finishing up the bathroom and will be moving onto the ceilings and wood flooring for the two 2nd floor dressing rooms. Each room is 200 square feet!! This weekend the walls will be painted. Think clean-bright-and-white. The spaces will be IDEAL for picture-perfect wedding party photos!!! Once the ceilings, and flooring are installed, let the decorating begin!!! Cannot wait! Check out our MOODBOARD for our design inspiration!



4/19/2023

Landscaping!

This week we received 52 beautiful Green Giant Arborvitae, 10 Hydrangea Tres, and 1 Weeping Cheery Tree from Sprucedale Gardens, Woodstock, CT. Planting the trees was a labor of love! Once the Hydrangea Trees are planted, Phase 1 of landscaping will be complete. Phase 2 will include additional Arborvitae, Annabelle Hydrangea, Rhododendrons, and flowering perennials! Thank you, Alan and Gahrett for the much needed help to get the project started!



4/14/2023

2nd floor updates!

The black metal ceiling has been completed on the 2nd floor! Shiplap continues on the west wall. It’s so pretty!!! Next, we will be installing the flat ceilings and adding wooden panels. Plumbing is underway for the bathrooms! Our stunning firework chandeliers will be delivered and installed this week!!

Next week Sprucedale Gardens Nursery and Greenhouse in Woodstock, will be delivering 52 Green Giant arborvitaes, hydrangea trees, and a weeping cherry tree!!!

Stay tuned for more updates and as always, thank you for sharing!!



4/2/2023

Shiplap!!

It’s been a busy couple of weeks at the farm with tours and construction! Ceiling-mounted AC/heating units are being installed on both the 1st and 2nd floors. If you are looking for a reliable and professional HVAC company, call Robert Wagner, owner of The HDL Co!

The electrical work is close to being finished! Can’t wait for the beautiful light fixtures to go up!

And Rick, our wonderfully talented carpenter is installing shiplap!!! Planning on painting the new shiplap and keeping the beauty of the original lower section!!

Stay tuned for more updates!!!



3/9/2023

OO-LA-LA

Hi everyone!! So much progress has been made over the past few weeks!! The electrical is approaching the finale and all light fixtures have been decided upon. Mike, Carson, and I spent last weekend tearing down the remaining cardboard ceilings original to the coop. Only had to remove a few thousand nails LOL! Rick has been very busy insulating the 2nd-floor ceiling and adding more beam work. Take a look at the black metal ceilings!!! Not an easy installation but my goodness it is beautiful! The wood beams contrasting against the black……gorgeous!! What do you think?!?!



2/24/2023

BEAMS!!

The beams are here!! Yesterday, specially ordered, 14 ft Douglas Fir beams were delivered to The Coop! Despite the low temperatures, Rick was hard at work installing these beauties on the second floor. When completed, every 10 feet running the length of the venue, the beams will expand across the center opening, run up the ceiling knee wall and finish off at the peak. The contrast between the wooden beams, black metal ceiling, and stunning chandeliers, will leave guests in awe!! The pictures below show the horizontal beams. Next week Rick will start on the vertical and ceiling beam installation! I’ve also included images from my design idea board for the ceiling.



2/4/2023

More windows and electrical!!

Can’t hold back the excitement, had to post another update! Our friend Rick, is hard at work again today installing beautiful windows that overlook the future ceremony area and covered bridge. Electrical work is also proceeding!!! With this in mind, my Amazon list of light fixtures is growing. I thoroughly enjoy this stage of design!!! Picking out the jewelry for the coop :)



1/5/2023

Framing, almost done!

Framing for the 1st-floor bathrooms, the Blue Spruce Wedding Suite, the catering room, and the bar are finished! The Blue Spruce Wedding Suite will be a handicap-accessible room conveniently located near the ADA-compliant bathroom. The suite can alternatively serve as a 1st-floor sitting room for guests.

Caterers will love the meticulously designed prep room with their very own private building entrance and service entrance to the main hall.

The ~15ft bar will accommodate 2-3 bar tenders and provide ample space for guests.

Electric work will continue at the end of the week!



1/4/2023

From the Windows to the Walls!!!

Hi everyone!! We have several updates here at the farm. To keep the historical integrity of the coop, Mike and I decided to keep the original windows that run along the front of the venue. The North and East sides of the venue are receiving energy-efficient replacement windows.

The dance floor is in!!!! Guests get your dance shoes ready and let the conga lines commence on the 60’ by 12’ medium-tone dance floor!

Our hand-scraped wood flooring is also in! Look how beautifully the flooring contrasts against the lighter Douglass Fir beams.

Stay tuned for more updates!!!



12/30/2022

Electrical

The electrical is being updated at the coop this week. With help from friends and family, the power line has been run from the street to the coop. Not an easy process!! Thank you to everyone involved for all of your hard work!



12/21/2022

Vaulting

Rick was very busy this week vaulting the ceiling on the second floor. The transformation is remarkable! He has about 30 more feet to go. Next, we will be purchasing large beams that will run across the opening and tie the two sides together.



12/03/2022

Railing Panels

This weekend we saw a lot of change in the venue. With help from friends and family, the concrete has been removed from the second floor! Mike and I ordered the hardwood flooring and the laser-cut metal railing panels were delivered!!



11/28/2022

Walls!!

In just a day we have almost all of the walls framed on the second floor. We have planned for one bathroom designated for the bridal party, two elegantly-spacious dressing rooms, a fireplace sitting area, and a lounge. Framing will continue and then the 1st floor will begin. Progress!!!



11/23/2022

The Stairs Are In!!

This week our builder, Rick, was hard at work transforming the main access point to the 2nd floor of The Coop. Permanent treads will be installed once we are finished with construction. We also picked up a historic-sliding barn door this afternoon! The plan is to remove the paint and make the hardware and rails pop!



11/19/2022